News
Hosted on MSN10mon
Mumbai Metro 3 underground Aqua Line to start next week: Check ... - MSNMumbai Metro Line 3 Details and Operation Timings The Metro Line 3 project covers a total corridor length of 33.5 kilometers, with a completion date expected by March 2025. Once fully operational ...
The Mumbai Metro Line 3 will operate from 6:30 am to 10:30 pm on weekdays and from 8:30 am to 10:30 pm on weekends. The fares will range from ₹ 10 to ₹ 50.
Tender Submission Deadline is July 30, 2025. Metro Line 4 stretches 32.3 km from Wadala to Kasarvadavali, and is fully elevated with 30 stations.
Mumbai Metro Line 7A reached a major milestone with the successful breakthrough of the second and final tunnel of the corridor connecting Andheri (East) to Mumbai airport, the Mumbai Metropolitan ...
Maharashtra Govt Approves Loan Guarantee For 6 Key Mumbai Metro Projects; Combined Cost Of All Corridors Exceeds ₹36,000 Crore The six Metro corridors include Metro Line 5 (Thane–Bhiwandi ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results